The silo tower and building A on the Campus Remy site (a development of the Dutch BAM group) is now completely sold out. The last available floors were sold through the intermediation of Aximas to SERTIUS (863 m²), SPIRITUS (380 m²) & P. VANDENHOUT (863 m²).
